Customer Information

The Customer Labtown would like to create a new vSphere 5 enviroment to run some new production requriements with five hosts that was recently re-purposed from a sister company. The hosts have two eight core 2GHZ CPU with 64GB of memory each. Each host currently has 1 quad port 1GB network card onboard with two empty PCI slots for further expansion. The current storage will be used for this project so storage isn't a concern. The new hosts must be able to handle all networking requirements of the new vSphere enviroment. There is no money in the budget for extra hosts but additional network cards can be purchased if needed.

Create a logical Network design for Labtowns new vSphere Enviroment

Requirements

- The following port groups need to be in place: Mgmt, FT, iSCSI, VM Network, Backup, vMotion, and DMZ
- No single points of failure
- The new VM Network will need to be able to handle 2.43Gbps of traffic

Instructions

- Place any switch policies under the policy section in the right corner
- Place the hosts onboard PCI slot on the top of the workspace
- Place additional PCI Slots below the onboard PCI slot
- Place vSwitches to the left of onboard nics and place physical switches to the right
- Connect all connections with the standard connector

Notes

- All port groups are in the list you may have to scroll down to see the last one depending on the web browser or screen resolution
Policies